WCDA Blog

An Owner’s Top 3 Action Items for Organizational Preparedness

An Owner’s Top 3 Action Items for Organizational Preparedness

Do you have a one-time mega-project that you don’t have the capacity or capabilities to deliver? Is your capital improvement program growing quickly and you need to equip your staff with the right skills and relevant knowledge to keep up with the rising demand? Do you need to decrease your average project delivery time due to rate-payer or political pressure? All of the above?

read more
Developing the Right Team for Success on Your Next Design-Build Project

Developing the Right Team for Success on Your Next Design-Build Project

Pursuing, winning, and successfully executing design-build projects requires having the right team in place for the project. The “right” team has the experience and diversity to foster creativity and increase the quality of solutions for the owner while identifying and addressing the unique challenges associated with the project.

read more
Why You Should Consider Progressive Design-Build for Your Next Water/Wastewater Project

Why You Should Consider Progressive Design-Build for Your Next Water/Wastewater Project

Do you have an upcoming project where cost and schedule certainty are critical? Are project costs increasing on your design-bid-build projects? Do you have the funding to build projects, but not enough in-house project management staff? Do you want to take your projects to the next level with total collaboration? If you answered “yes” to any of these questions, progressive design-build might be the ideal collaborative-delivery method for your next water/wastewater project.

read more
Clarify to Specify

Clarify to Specify

Words are important — an obvious truism and pertinent to a collaborative project delivery effort. The action item is to ‘mobilize the language’ for maximum effect in our contract documents for water/wastewater projects. First, a quick anecdote: A lawyer friend (not mutually exclusive) shared a simple and keen observation when I first worked with him on a contract review. He asked, “Know the difference between an engineer and a lawyer?” After searching my library of lawyer jokes, I had to admit ignorance of the difference. He said, “Lawyers know they’re not engineers.”

read more
When Changing Enabling Legislation – Keep It Flexible

When Changing Enabling Legislation – Keep It Flexible

Water Design-Build Council (WDBC) research confirms a significant increase in growth in the use of collaborative-delivery methods for water and wastewater projects in the US. For certain public owners, including some cities, counties, districts, agencies, special purpose entities, and states, where historically only design-bid-build (DBB) has been utilized for implementing capital works projects, enabling legislation modifications may be required so these public agencies can utilize collaborative delivery methods such as fixed-price design-build (FPDB), progressive design-build (PDB), and construction management at-risk (CMAR).

read more
Collaborative Contracting: How To Be An Ally

Collaborative Contracting: How To Be An Ally

How many times have you read about construction projects that are delayed, over budget, have quality issues, or involve complicated claims? Historically, these are common occurrences in the construction industry that primarily derive from a misalignment of incentives between project owners, engineers, and contractors. Traditional contract models, which often position owners and contractors on different sides, are typically the root of the problem, yet they are still in widespread use, creating the risk of continued project overruns and performance shortcomings.

read more
Team Structure – What Does This Really Mean?

Team Structure – What Does This Really Mean?

The major tenet of design-build is collaboration. Our clients require a solution to their project that is built by a group of highly qualified and experienced design and construction professionals. The collaboration required to meet that demand is not simply between the design-build team and the owner, but also between each of the professionals within the design-build team.

read more
Is Design-Build Right for Your Smaller Project?

Is Design-Build Right for Your Smaller Project?

Design-build has become the fastest-growing delivery method in the water/wastewater industry across the nation. Cost certainty and accelerated schedules have encouraged most states to embrace the design-build model. In the current market, large-scale design-build projects receive most of the headlines, but design-build can be a perfect fit for your small-scale projects.

read more