Most major construction projects in the water and wastewater industry have conventionally been delivered through a design-bid-build (DBB) method of delivery. However, collaborative project delivery (CPD) methods are being considered more frequently in the public sector because they can provide a variety of benefits over traditional delivery methods such as time and/or cost savings. It is important to recognize that these benefits sometimes come with trade-offs, such as reduced control or change in risk, so the pros and cons of each CPD method need to be weighed.
How Do You Decide the Best Project Delivery Approach?