Pipeline

Northeast Flow Control Facility (MI)

This project created the necessary flow control capabilities to isolate the water treatment plant for major renovations in the future. Water from other plants will be able to be used with the bypass created off this project when this plant receives a major overhaul.

read more

CSX Camden Street Storm Drain Replacement (MD)

The CSX Camden Street Storm Drain Replacement was a technically complex, design-build project located in a heavily traveled section of downtown Baltimore, Maryland, which consisted of replacing a 48-inch-diameter brick storm drain, originally built in 1891, that...

read more

Edward W. Bailey Water Treatment Plant (CO)

As a pioneer in providing four utility services (electric, gas, water, and wastewater) in one enterprise, CSU needed to increase its water production in order to meet future demands for safe, economical, and reliable water supply. Population growth and aging...

read more

Jacksonville Total Water Management Plan (FL)

The Jacksonville, FL, Total Water Management Plan (TWMP), Segment 2 River Crossing Project, is a progressive design-build delivery of a massive directional drilling job that required the installation of 6,700 feet of 36-inch steel pipe under the St. Johns River. The...

read more