Timing Can Be A “Risky Business”

Timing Can Be A “Risky Business”

The discussion on risk allocation and project contingency versus design-builder contingency has been well documented in several previous blogs. The WDBC Water and Wastewater Design-Build Handbook also provides excellent guidance on best practices for risk allocation. However, my recent experiences on current projects have led me to believe that, far too often, a project’s price, contingency, and schedule are adversely impacted by not addressing project risks with the right team members at the right time, and this topic is worthy of further discussion.

read more
Developing the Right Team for Success on Your Next Design-Build Project

Developing the Right Team for Success on Your Next Design-Build Project

Pursuing, winning, and successfully executing design-build projects requires having the right team in place for the project. The “right” team has the experience and diversity to foster creativity and increase the quality of solutions for the owner while identifying and addressing the unique challenges associated with the project.

read more
Team Structure – What Does This Really Mean?

Team Structure – What Does This Really Mean?

The major tenet of design-build is collaboration. Our clients require a solution to their project that is built by a group of highly qualified and experienced design and construction professionals. The collaboration required to meet that demand is not simply between the design-build team and the owner, but also between each of the professionals within the design-build team.

read more
Is Design-Build Right for Your Smaller Project?

Is Design-Build Right for Your Smaller Project?

Design-build has become the fastest-growing delivery method in the water/wastewater industry across the nation. Cost certainty and accelerated schedules have encouraged most states to embrace the design-build model. In the current market, large-scale design-build projects receive most of the headlines, but design-build can be a perfect fit for your small-scale projects.

read more
Dispute Boards on Water/Wastewater Projects?  Why Not?

Dispute Boards on Water/Wastewater Projects? Why Not?

I have always been perplexed as to why dispute boards are so rarely used on water/wastewater projects. They enjoy a long history of successful use on transportation projects—particularly tunneling projects and big-dollar design-build projects. Most transportation owners find dispute boards helpful, and it is clear that they provide the parties with a vehicle to get real-time resolution of project challenges. But it seems that water/wastewater owners and owner advisors don’t even give a thought (let alone a second thought) to considering the use of a dispute board when they put together their contracting approach for a non-tunneling project.

read more
Best Practices for Accelerating a Design-Build Project Schedule

Best Practices for Accelerating a Design-Build Project Schedule

Compared to the traditional design-bid-build method, design-build delivery can accelerate design and construction schedules by 20% to 30%. Many cities and counties have implemented new fast-tracked permitting review processes to reduce the turnaround time for issuing permits, which are critical to maintaining the construction schedule.

read more