The CSX Camden Street Storm Drain Replacement was a technically complex, design-build project located in a heavily traveled section of downtown Baltimore, Maryland, which consisted of replacing a 48-inch-diameter brick storm drain, originally built in 1891, that...
Progressive Design-Build
Westerly Wastewater Treatment Plant Centrifuge Replacement (OH)
NEORSD’s decision to use progressive design-build (PDB) project delivery was based on the need to move more quickly, save money, and promote collaboration—resulting in a better approach than possible with traditional design-bid-build (DBB). PDB also gave NEORSD full...
Decatur Wastewater Treatment Plant MBR Expansion (AR)
In 2014 the city of Centerton began experiencing an unexpected growth spurt, almost doubling its size, forcing the City of Decatur to research wastewater treatment plant expansion options to accommodate the population growth.
Edward W. Bailey Water Treatment Plant (CO)
As a pioneer in providing four utility services (electric, gas, water, and wastewater) in one enterprise, CSU needed to increase its water production in order to meet future demands for safe, economical, and reliable water supply. Population growth and aging...
Dodd Water Treatment Plant Upgrades (CO)
The partnership between Burns & McDonnell, Garney Construction, and the District during all aspects of design and construction was vital to this project's success. The accelerated project schedule would not have been possible without using a design-build approach....
Basin VB 340 Design-Build Sewer Rehabilitation (VA)
To fulfill the objectives of the Clean Water Act and achieve full compliance, HRSD used the progressive design-build project delivery method to rehabilitate Basin VB 340 in Virginia Beach, VA.
Boise White Paper Aquifer Storage and Recovery (WA)
Montevina Water Treatment Plant Improvements (CA)
San Jose Water Company used a two-step procurement (progressive design-build) process to select the design-builder for the project. The initial RFQ was followed by an RFP to three short-listed teams, with HDR selected after the proposal review and interview process.
Jacksonville Total Water Management Plan (FL)
The Jacksonville, FL, Total Water Management Plan (TWMP), Segment 2 River Crossing Project, is a progressive design-build delivery of a massive directional drilling job that required the installation of 6,700 feet of 36-inch steel pipe under the St. Johns River. The...
