The design-build project delivery approach continues to deliver value to municipal water utilities. From a single point of responsibility and integration to cost certainty and timely delivery, design-build can help create a more streamlined and seamless project experience.
Collaborative Delivery
An Owner’s Top 3 Action Items for Organizational Preparedness
Do you have a one-time mega-project that you don’t have the capacity or capabilities to deliver? Is your capital improvement program growing quickly and you need to equip your staff with the right skills and relevant knowledge to keep up with the rising demand? Do you need to decrease your average project delivery time due to rate-payer or political pressure? All of the above?
Using Collaborative Delivery to Mitigate Supply Chain Disruption
When we emerge from the extreme days of the COVID environment, there will be some lingering effects that become a permanent part of our way of doing business. Management of the supply chain is probably one of the most significant.
Clarify to Specify
Words are important — an obvious truism and pertinent to a collaborative project delivery effort. The action item is to ‘mobilize the language’ for maximum effect in our contract documents for water/wastewater projects. First, a quick anecdote: A lawyer friend (not mutually exclusive) shared a simple and keen observation when I first worked with him on a contract review. He asked, “Know the difference between an engineer and a lawyer?” After searching my library of lawyer jokes, I had to admit ignorance of the difference. He said, “Lawyers know they’re not engineers.”
When Changing Enabling Legislation – Keep It Flexible
Water Design-Build Council (WDBC) research confirms a significant increase in growth in the use of collaborative-delivery methods for water and wastewater projects in the US. For certain public owners, including some cities, counties, districts, agencies, special purpose entities, and states, where historically only design-bid-build (DBB) has been utilized for implementing capital works projects, enabling legislation modifications may be required so these public agencies can utilize collaborative delivery methods such as fixed-price design-build (FPDB), progressive design-build (PDB), and construction management at-risk (CMAR).
Collaborative Contracting: How To Be An Ally
How many times have you read about construction projects that are delayed, over budget, have quality issues, or involve complicated claims? Historically, these are common occurrences in the construction industry that primarily derive from a misalignment of incentives between project owners, engineers, and contractors. Traditional contract models, which often position owners and contractors on different sides, are typically the root of the problem, yet they are still in widespread use, creating the risk of continued project overruns and performance shortcomings.
Is Design-Build Right for Your Smaller Project?
Design-build has become the fastest-growing delivery method in the water/wastewater industry across the nation. Cost certainty and accelerated schedules have encouraged most states to embrace the design-build model. In the current market, large-scale design-build projects receive most of the headlines, but design-build can be a perfect fit for your small-scale projects.
Innovative Technologies Play Key Role in Gaining Winning Advantage in Competitive Collaborative Delivery Projects
The word innovative is talked about a lot in the water and wastewater industry, but as an industry we have been slow to accept technology innovation. I have been in the industry for 30+ years and participated in several industry efforts with WEF, AWWA, NSF, and EPA—like the EPA’s Environmental Technology Verification (ETV) program, WEF’s LIFT program, etc.—to increase the use of innovative and new technologies. These programs typically test the equipment through a range of conditions and a report is written on the testing.
Remember the Yugo!
Remember the Yugo? Wikipedia reminds us that you could buy one of these imported cars brand new for $3,990 in 1987.2 That’s about $9,1003 in 2020 dollars—about a third less than the least expensive new car that you can actually buy today (which, according to Automobile Magazine, is a 2020 Chevrolet Spark LS for $14,395,4 if you happen to be in the market).
Operating the Water Resource Recovery Facility: It’s a Business
A growing number of utility managers and influencers in the wastewater sector are transitioning to an operating model that mirrors private industry. One of the leading reasons for this shift is the fact that major infrastructure has not received the investment needed to keep pace with a changing economy and environment, let alone innovations in technology. To bridge the gap between their current operations and this new model, utilities are frequently turning to progressive-design build.